Single vs double storey extension cost is one of the first things we're asked about on survey visits across Dorset, and the answer catches most people out. Going up a floor doesn't double the bill. It usually brings down the cost of every square metre you add, because the priciest parts of the job, the foundations and the roof, get shared across twice the floor space.


Below we've set out what each option typically costs with us in 2026, how planning differs in the BCP and Dorset Council areas, how long each takes on site and when a single storey is still the better call. The figures are build costs for a mid-range finish, before VAT and design fees. They're a guide, not a quote: your house, your ground and your spec decide the real number.


Single storey brick house extension under construction at the rear of a home in Dorset, with roof and bricklaying work in progress

What a single storey extension costs in Dorset


For a single storey rear or side extension we'd typically be looking at around £2,650 to £3,500 per m² for a weathertight, plastered and decorated room with heating and electrics in. On a common 20m² kitchen-diner that's roughly £53,000 to £70,000. A bigger 30m² open-plan space lands nearer £80,000 to £105,000.


Where you sit in that range comes down to a few things we look at closely before pricing:


  • Glazing. Wide bifolds, sliders and rooflights are often the biggest single swing in the price.

  • Ground conditions. Clay around Broadstone and Ferndown, sandy heathland soil out towards Verwood and any mature trees nearby all change how deep the foundations need to go.

  • Drains. If a manhole or public sewer sits where the extension is going, it has to be diverted or covered by a build-over agreement.

  • Structural openings. Knocking through the back wall means a steel beam, designed with a structural engineer.

  • Kitchen and finishes. Units, worktops and flooring vary so much that we usually price them as a separate line.


What a double storey extension costs


A two-storey extension usually comes in at around £2,400 to £3,350 per m² of new floor area. The total is bigger, but the rate per square metre is lower than going single storey. Take that same 20m² footprint and build up, and you get 40m² of space for somewhere between £96,000 and £134,000.


The reason makes sense once you've watched one go up. The foundations get dug and poured once. There's one roof. The scaffold is going up either way. What you're really paying for on the first floor is extra walls, floor joists, windows and the upstairs finishes. That's why, if a family's outgrowing the house and the plot allows it, we'll normally price both options at the survey visit so you can see the difference in black and white.


Upstairs space tends to mean bedrooms and en-suites, and an en-suite brings water, waste runs and extraction that a bedroom on its own doesn't. We handle the plumbing, heating and electrical side ourselves, so the bathroom isn't left waiting on another firm's diary.


Planning permission: where the two really differ


This is often what settles it. A single storey rear extension can usually go 3m deep on a semi or terrace (4m on a detached house) under permitted development, and further through the prior approval route. Two-storey extensions are much more restricted. To count as permitted development they can only project 3m, must sit at least 7m from the rear boundary, and any upper-floor side windows have to be obscure-glazed and fixed shut.


Most two-storey plans we see on Bournemouth and Poole plots don't clear that 7m rule, so they go in as a householder planning application with an eight-week target for a decision. That's not a reason to rule it out. It just means building the wait into your timeline and getting the design right for the neighbours from the start. Flats, conservation areas and houses where permitted development rights have been removed need full permission either way. Our guide to planning permission for extensions in the New Forest covers the wider rules in more depth.


How long each one takes


On site, a single storey extension is typically 10 to 16 weeks from groundworks to decoration. A two-storey job is closer to 16 to 24 weeks, mostly down to the extra brickwork, a roof going on at height and the upstairs first and second fix. Before any of that there's the lead-in: drawings, structural calculations, planning if it's needed and a building regulations application, with an inspector visiting at the key stages.


In winter we plan the groundworks around the weather. We'd rather lose a day than pour concrete into a waterlogged trench, and anyone who's seen a Dorset November will know why.


Which one is right for your house?


Go single storey if what you're after is a bigger kitchen or a family room opening onto the garden, or if planning or a neighbour's light makes a second floor unlikely. It's quicker, less disruptive, and most clients stay living at home throughout.


Go double if you need another bedroom as well as more living space. Building both floors at once nearly always works out cheaper than a single storey now and a storey on top later. Adding a floor to an existing extension often means strengthening foundations that were never designed to carry it, which is something we get asked about a lot around Christchurch and Wimborne. It's rarely the bargain people hope for.


Whichever way you're leaning, we survey the property before putting a price on anything, check the drains and ground, and give you a clear written price for each option so you're comparing like with like.