Builder Left the Job Unfinished? A Southampton Guide

Nov 1
4 min read

If your builder left the job unfinished, you're probably standing in a half-built extension in Southampton wondering who to call first. It happens more often than people think. A builder takes a deposit, gets the footings in or the walls up to plate height, and then the calls stop being answered.


We get asked to take over jobs like this right across the city, from 1930s semis in Bassett and Sholing to Victorian terraces in Portswood and Shirley, and out towards Eastleigh, Chandler's Ford and Totton. Here's what we'd do in your shoes, and how we pick up where someone else left off.


Half-finished single-storey rear blockwork extension on a 1930s semi in Southampton, Hampshire, left unfinished by a previous builder

First, make the site safe and write everything down


Before you think about money or blame, deal with the building itself. An open trench, a wall opening with no lintel, or a roof stripped and left under a tarp can turn into a much bigger problem after one wet week in November. If anything looks structurally doubtful, keep people out of that part of the house until it's been looked at.


Then build a record while it's all still fresh. Our advice is always the same:


  • Photograph every part of the work, inside and out, with the date showing.

  • Gather the quote, any contract, texts, emails, invoices and payment receipts.

  • Note which materials are on site and which you've paid for but never seen.

  • Write a short timeline: when work started, when it stopped and what was promised.


That record is the first thing anyone will want to see, us included. It's also what you'll need if you try to get money back.


Give the builder a fair, final chance in writing


Sometimes there's a reason behind the silence. Illness, a supplier going bust, a van that's been nicked. Send a calm written message setting out what's outstanding and giving a reasonable deadline to come back and finish, often around 14 days. Under the Consumer Rights Act 2015, a trader has to carry out a service with reasonable care and skill and within a reasonable time, so you're well within your rights to ask.


If you paid some of it on a credit card and the job was priced between £100 and £30,000, Section 75 may let you claim from the card provider as well. We're builders, not solicitors, so get proper advice on the legal side before you end the contract. What we'd say from experience is simple: don't pay another penny for work that hasn't been done, and don't let anyone else start until that deadline has passed.


Find out where you stand with building control


This is the bit that catches people out. Extensions, loft conversions, structural alterations and most electrical work have to be notified to building control. In Southampton that's normally the city council's building control team, unless the original builder appointed a private approved inspector.


Ask whether an application exists for your address and which inspections, if any, have been carried out. You'll usually find yourself in one of three positions:


  1. It was notified and inspected up to a point. The good news is the next contractor can usually carry on under the same application.

  2. It was notified, but key stages like foundations or drainage were never inspected. Some work may need opening up so it can be checked.

  3. Building control was never told. The work can usually be brought into line through a regularisation application, which means exposing and checking work that's already been covered up.


Regularisation is a pain, but it's far better than discovering the gap when a buyer's solicitor asks for completion certificates. Our guide to what paperwork your builder should give you lists everything you should end up holding.


How Complete Builds takes over an unfinished job


We treat a takeover as a new job, not a quick finish. It starts with a survey visit where we check what's been built against the drawings, look at foundations and drainage wherever we can get to them, and test anything electrical that's been left live. Half-done jobs nearly always hide something. We've found steel beams sitting on padstones that were never built, drain runs laid with no fall, and cables buried in plaster with no protection at all.


You then get a clear written price in two parts: putting right anything that's wrong, and finishing the job as it was designed. Where we genuinely can't tell what's behind a finished surface, we say so in writing rather than guess.


Because our general construction and building team works alongside our own plumbing, heating and electrical engineers, we can usually finish everything ourselves rather than bringing in another round of strangers. On a takeover that matters, because the last thing you need is three more people pointing at each other.


What we can and can't guarantee


We'll be straight with you here. We guarantee the work we carry out, in writing. We can't put our name to work we haven't seen, so anything you want to keep from the previous builder gets inspected first. If it can't be checked properly without opening it up, we'll tell you that and explain what it would involve.


That honesty is usually why people come to us after a bad experience. If you're still choosing who to trust with the rest of the work, the warning signs in our piece on cowboy builders in Bournemouth apply just as much in Southampton. Most of the jobs we rescue showed at least two of them from day one.