top of page

Builder Site Survey in Bournemouth: What We Check First

Sep 18
4 min read

Updated: Nov 2

Ask us for a price on an extension, a wall removal or a full rewire and the first thing we'll do is ask when we can come round. Not because we're being awkward. It's because a quote written from a few photos and a floor plan is a guess, and a guess is how jobs end up over budget halfway through. We've been surveying homes across Bournemouth for years, from the 1930s semis in Moordown and Winton to the big Victorian villas in Westbourne, and the survey is where most of the surprises get found. Here's what we're actually doing while we're poking about in your loft.


Builder surveying exposed floor joists during a pre-quote site survey in a Bournemouth home

Why we won't quote from photos


A photo tells us what a room looks like. It doesn't tell us whether the wall you want gone is holding up the floor above, whether the consumer unit has any spare ways, or whether the drains run under the exact spot you'd like the new kitchen to go. Those three things alone can swing a quote by thousands.


Bournemouth's housing stock makes this worse, not better. A lot of the town went up between the wars, and those houses have been extended, re-roofed and rewired several times since, often by different people with different ideas. We've opened up ceilings in Charminster and found three generations of wiring side by side. In Southbourne, the salt air quietly eats steel lintels and fixings, so an outwardly tidy bay window can be hiding a lintel that's rusted through. None of that shows up on a phone camera.


So we come out. A typical survey takes 45 to 90 minutes, longer for a whole-house renovation, and we'd rather spend that time up front than argue about extras later.


What we check on the day


  • Structure: which walls are load-bearing, how the floor joists run, what's sitting above the wall you want to remove, and whether there are already steels in the building from previous work.

  • Services: where the incoming gas, water and electric are, the age and condition of the consumer unit, and how the drains run. We lift the covers, every time.

  • Access: how we'll get materials in and rubble out. A terraced house in Pokesdown with no side access costs more to work on than a detached one in Talbot Woods with a driveway, and the quote should say so.

  • Condition: damp, rot, movement cracks, the roof covering, and the state of any existing extension we'd be tying into.

  • Ground and levels: for extensions and garden buildings, where the water goes when it rains, tree roots, and whether the ground will need deeper foundations. Bournemouth's sandy soil is generally kind; the clay pockets around Kinson and West Howe aren't.


We also talk. What do you want the space for, what's the budget you'd rather not go over, and what's the deadline that actually matters? A baby due in March is a real deadline. 'Sometime in spring' isn't. That conversation shapes the quote as much as the tape measure does.


The extra checks a survey sometimes triggers


Some jobs need a specialist opinion before we can put a firm number on them, and we'd rather tell you that on the day than bury it in the small print. The three that come up most often in Bournemouth:


  • Structural engineer's calculations. For any load-bearing wall removal or new steel we get an engineer to visit and specify the beam. Expect £420 to £850 for a visit and calculations on a single steel, more where there are several beams or a complex opening. Building Control will want those calcs anyway.

  • Asbestos refurbishment survey. Anything built or refurbished before 2000 can have asbestos in textured ceilings, floor tiles, soffits or old boiler cupboards. For a three-bed semi, budget £480 to £840 for a refurbishment survey with samples. Not glamorous, but it protects you and it protects our team.

  • CCTV drain survey. If you're building over or near a drain, or the covers show signs of trouble, we'll run a camera through before we quote. Our drainage team charges £180 to £420 for a domestic survey with a recorded report, depending on how many runs there are and whether it needs jetting first.


Those are the figures we'd put in your quote, not a stripped-back trade rate. And not every job needs any of this. A bathroom refit or a run of fencing usually doesn't. But when it does, finding out at survey stage rather than in week two is the difference between a project that runs to plan and one that doesn't.


What you get back, and when


After the visit you'll get a written, itemised quote, usually within five to ten working days, longer if we're waiting on an engineer. It breaks the job down by stage so you can see where the money's going, states what's included and what isn't, and flags anything we couldn't verify on the day, like a floor we couldn't lift or a wall we'd need to open up. If we've spotted something you didn't ask about, say a fuse board that won't pass an inspection or a gutter dumping water at the base of the wall, we'll mention it. We won't pad the quote with work you didn't want.


One more thing from the trade side: if a price lands in your inbox before anyone has set foot in your house, treat it as a starting point rather than a promise. It might be right. It can't be certain, and the gap between the two usually turns up later as an 'extra'.


Related reading




Book your survey


If you're planning work on a home anywhere in Bournemouth, Poole or Christchurch, the next step is simple: book a site survey with Complete Builds and we'll come and look properly before we put a single number in front of you. Bring your questions and a rough budget. We'll bring a torch, a tape and an honest opinion.

Comments


bottom of page